One Nine Elms, London

Effisus Project

The project began in 2017 when initial construction began on the 10.3-acre (4.2 hectare) site. The overall construction consists of 12 (mixed-use) buildings including the three primary towers which extend upwards over 54 storeys.

When complete the towers will provide exception views over London, from the Thames and London Eye to the new American Embassy.

In order, to protect the façade elements and ensuring the protection of the building against driving rain and moisture preventing future corrosion, insulation deterioration and mould growth at the same time it increases the building energy efficiency and minimizes the condensation risk, Effisus Breather FR-B Membrane were applied.

Applied Solutions

B Class Fire Rated Breather FR-B Membrane/System