A new landmark is rising in the form of a high-rise project consisting of 4 towers with 3 combined basement levels and a ground floor in each tower. One tower will house a hotel on 28 floors, and the other serviced apartments on 21 floors. There is also a residential tower with 28 and an office tower with 12 floors.
The contractor chose state-of-the-art formwork technology for concrete works as a matter of policy in order to ensure both safety and speed as a matter of policy. Effisus assumed itself, from the beginning, as the ideal partner for the construction of this project, providing various types of materials that helped in its conception.
In this project, it is being used the A1 Class fire rated weatherproofing membrane Effisus Vapour FR to protect façade from environmental agents with superior fire resistance, and the Effisus Bonding KF+P Adhesive, a solvent free innovative adhesive whit exceptional properties of adhesiveness, waterproofing and UV resistance, that allow total freedom of work.